Our
Projects
We are dedicated to maximizing the use of electrical energy by utilizing the heat generated by cooling systems to produce energy.
Our experience, innovation, the latest technologies, and continuous company development guarantee high quality.
PROJECT
Airport
from Zurich
Cooling power: 3582 KW
Built surface: 1250 m2
Achieved hot water quantity at 40 °C
difference: 1`047`376
Liter/per day

PROJECT
SHELL
GERMANY
This is a Shell project. A gas station with a supermarket. We designed the supermarket with all-new cooling and deep-cooling features .
We also installed new refrigeration systems, including an outdoor freezing and cooling unit, and air conditioning with heat pump technology to produce hot water.
The energy efficiency is SEER for more than 5, which means 1 kW of input power equals 5 kW of thermal energy. This means thermal energy at no cost.

PROJECT
McDonald's
Air Conditional power: 82 KW
Air handling system: 15,000 m3/h
Achieved hot water quantity at 40 °C difference:
13.158 Liter/per day